Ericsson MiniLink Rogers Wireless Dual Polarity Protected. HSPA Roll-out Access Transmission

We were contracted to install, Program, Align and Test a Dual Polarity Ericsson MiniLink hop. Protected Horizontal and Vertical on a single link was implemented for Rogers Wireless Brockville RBS to DT as per RWI Engineering Specs and Upgrade change.

Cisco 7604 Rogers Wireless
Capacity Upgrade Access
Transmission

MGI Intelesystems was contracted for the Cisco 7604 and 3308 roll-out campaign. The photo above shows the completed installation of the new Rack, Cisco 7604 A1 switch and Emerson MHSA Power Converter and not shown in the picture on top of Rack Breaker Split Panel.

Global Live (Wind Mobile)

Installation of Cabinet, Conduit, Framing and AC electrical feed to the Cabinet. BBU Alarm Termination, Installation of DC Breakers and Wiring, Battery Install and Termination, OVP install and wiring in BBU and Hoffman box, All AC and DC install and terminations.

Optima T:LAN Rogers Wireless

Installation, test and Turn-up of Optima T:Lan for Rogers Wireless remote monitoring.

Rogers Cable -Cable Tray Implementation

Head End Cooling Project

rogers-logoMGI Intelesystems was contracted to Design and Project Manage the implementation of Over-Head Cable Trays for Rogers Cable Head End in York Mills and their location in Bloor. The purpose of the Over-Head Cable Tray Solution was to help cool the Data Centre’s by rerouting the cables from under the Raised flooring to the Over-Head Racks which will allow better air flow to the equipment and throughout the Head End.

Rogers LTE project

Ericsson Remote Radio Units 3

Ericsson Remote Radio Units (RRU), DCI Cabinet Ground installation.

Pinwheel Ericsson Remote

Pinwheel Ericsson Remote Radio Units (RRU) installation.

Our tower crews are all certified and experienced in all types of structures.

View some of the different types of structures we’ve worked on below.

tower crews

Need an installation quote for your next project?

Our efficient team is ready to provide pricing.